Build one. Change it. Undo it.
Pick an app, ask for a change, roll it back. Every company here is fictional, and the build is a simulation of the real thing.
Answers with their sources.
QHalden Homes dispute four days on contract H-2291. Who’s right?
They are. The off-hire was called in on 18 Sep at 16:42, and hire ends when the off-hire request is received. Invoice INV-55120 charges to 22 Sep, so credit the four days and recharge the breaker damage separately.
3 sources cited · every claim traceable
- 1CALL LOGOff-hire call, contract H-2291
Caller: Priya Shah, Halden Homes. Taken by Sam R. Off-hire requested for excavator EX-0412 and breaker BR-118.
- 3INVOICEInvoice INV-55120
Contract H-2291, period ending 22 Sep. Hire charged to 22 Sep. Customer disputes four days.
- 2TERMSHire conditions v4
Signed by Halden Homes on account opening. Hire ends when an off-hire request is received (cl. 9). Damage beyond fair wear and tear is recharged at cost (cl. 13).
- PHOTOSCheck-out photos, BR-118
Six photos, signed by the hirer’s driver. Tool retainer intact, no visible damage.
- COLLECTIONCollection note C-7731
Driver: Lee M. Site: plot 4, Halden Homes. Both items collected. Breaker tool retainer cracked, photographed.
- LOLERThorough examination, TH-208
Telehandler, 3.5 t. Examiner: competent person, independent. Examined 14 May 2026, no defects. Next due 14 Nov 2026.
Open a finished hire app.
Built for a scaffold hire contractor: assets, contracts, inspections and alerts. Sign in as any of six roles and change anything.
Your company, on its own apps.
Tell us one process that eats your week. We’ll show it running.